Apr 21, 2022
If every car would have a SourceLess Blockchain node (1 MB) installed (or preinstalled) on the main car's computer, through the SourceLess ecosystem - auto category (str.domain), any eventual frauds and deficiencies that can show up could be verified or accessed by the owner of the SourceLess Blockchain fork (which will provide limited access to the owner and/or manufacturer).
Issues covered by the SourceLess Blockchain system:
• Changes to the real mileage;
• Changes to the car's parameters;
• Security;
• History of generic errors invalidated in the main computer;
• The unique digital identity of the property;
• The car history, regardless of the service where it was fixed;
• The instant reporting of the vehicle errors to the service;
• Reminders of the various legal inspections that need to be performed;
• Checks required in order to eliminate the risk of crashes.
Right now, big auto companies around the world need such a system to be able to solve their software problems, and more. All the top auto brands face these problems and need such a system, like the one created by SourceLess Blockchain.
By fully integrating companies into the SourceLess PLATFORM, it solves all current cybersecurity problems, such as:
• Application Security;
• Cloud Security;
• Data Security;
• Identity Access Management;
• Infrastructure Protection;
• Integrated Risk Management;
• Network Security Equipment;
• Other Information Security Software;
• Security Services;
• Consumer Security Software.
STR.domain is a unique digital identity that allows anyone to connect to the SourceLess Platform.
• Every STR.domain owner will have to complete the KYC & AML verification before getting the full functionality of the domain;
• Based on the KYC & AML protocols, all identities will be clear and certified, which means that the system is WHITE LABEL 100%.
SourceLess auto-nodes will provide high efficiency and may be a solution to cyber threat in car theft, smart computational redundancy and extreme high-processing speed.
Integration with older cars without access to the internet can be acquired by communicating with any smartphone, and pairing it with the node, just by using the Bluetooth.
The system that SourceLess creates goes even deeper than other current solutions. SourceLess is going into a real unbreakable/unhackable 'keyless-go' (without the need of a car key) based on the smallest and smartest technology, named zero-knowledge snark (SNARK) working as a validation system, where proof will be the node str.car-vin with the connection to str.owner.
All of the system is described in the SourceLess Blockchain whitepaper.
Iulian Bondari
[email protected]
www.sourceless.io
A perfect storm of unhappy citizens and wary investors has France facing an economic crisis.
A chef worked at a high-end Sydney restaurant. The fair work umpire ruled his dismissal was harsh, unjust and unreasonable.
The Australian sharemarket whipsawed on Wednesday as banks and tech stocks advanced and data centre company NextDC plunged.
Manhattan Gold’s maiden drilling revealed district-scale potential at its Hook Lake project in Canada, with high-grade gold and a new polymetallic discovery uncovered.
The disgraced war hero’s public relations offensive includes a two-and-a-half hour media interview, the launch of a clothing brand and an Instagram page.
The Andrew Forrest-backed miner has sacked a manager at the centre of a months-long sexual harassment and bullying investigation.
Locksley Resources established a field base at its vast 1000-square-kilometre Greater Tottenham copper-gold project in NSW, advancing plans for a 15,500m drilling blitz.
Red Metal is putting its monster Sybella rare earths resource to the processing test, kicking off six-metre column leach trials to prove whether it can develop a cheap, heap leaching QLD operation.
Orbit Resources has hit 11.8m of massive sulphides at its Lewis Ponds project in NSW, including 3.55m estimated at 50 of the precious sulphides, with assays pending.
Sarytogan Graphite’s definitive feasibility study has valued its 50,000tpa Kazakh graphite project at A$190M, with just A$115M in upfront capital earmarked for a 50-year operation.
Sarytogan Graphite’s definitive feasibility study has valued its 50,000tpa Kazakh graphite project at A$190M, with just A$115M in upfront capital earmarked for a 50-year operation.
Platina Resources has applied for a vast NT tin tenement package, uncovering four intriguing magnetic targets that could hold the key to a decades-old geological mystery.
YOUR NEWS, OUR NETWORK.
Do you have Great News you want to tell the world?
Be it updates about your business or your community, you can make sure that it’s heard by submitting your story to our network reaching hundreds of news sites across 6 verticals.